D-Day 22/06/2021 and 21/09/2021: ZEBRA GROUP produces very nice cars, designed for municipal services, with dozens of different bodies. For faster foreign expansion, we have negotiated an investment. At the same time, there are synergies - ELZEBRA electric cars can have HE3DA batteries, which the Venture Club has access to. Club members can find details after logging in. Sign up (or register), the investment is for club members only.
ZEBRA utility vehicles Photogallery FORBES
Interview on ČRO plus about the upcoming electric ZEBRA with HE3DA battery
Addendum to 06/23/2025: elZEBRA has been successfully approved and will be on display today and tomorrow at DEMOPARK 2025 in Eisenach, Germany.
Addendum to 06/05/2024: 12th vehicle funded. The company moved to new premises in Hradec Králové.
Addendum to 06/29/2023: (publication September 23) Zebra has renewed/obtained ISO 9001.2015 for vehicle manufacturing and sales. Download a scan of the certificate below.
There was a nice article about ZEBRA cars in the Municipal Technology magazine 4/23. Below is a downloadable scan of the article including photos from the company.
The first wave of registrations of SPV shareholders in the register of shareholders from investors who requested it took place.
...
Show older messages >We have been following ZEBRA GROUP for over two years. Especially the electric ELZEBRA, even with the HE3DA battery, is an interesting competitive product. In our country alone, there is a potential of 3.5 thousand vehicles in municipal services in the coming years, not to mention foreign markets. The carmaker not only handles individual units through its existing dealer network of partners, but also contracts for dozens of vehicles for a single customer. That's why we decided to take a look at a possible investment on June 17, 2021 and then again on September 21, 2021. By the way, at the presentation in June there were two Zebras to look at - an electric and a diesel (photos in the Gallery). We liked the presentations, so we agreed how to specify the way to involve the Venture Club and opened the investment. In November 2021 we paid the first tranche, in December the second and in August 2022 the third (third 10 million CZK). We bought a total of 18% of the company, for 30 million CZK, through a company bringing together investors (SPV). In the first year of cooperation, the company increased its production 4 times. We consider the investment to be very promising.